Limited Time Offer
Quote Expiration:
April 16, 2026

Countdown
Our Price:
$6,136.23
You Save
$1,078.74
OUR PRICE
$6,136.23
BUY-TODAY PRICE
$5,057.49
As Low As
$117.41
Per Month
*Estimated monthly payment based on available financing options. Subject to credit approval, terms, and conditions.
Satisfaction Guarantee
*Warranties Included
Expert Installation
Discounts applied are valid for appointment only and will revert to our standard pricing the following day.
Project Scope |
Amanda Vogel
Project Address: 2119 Guernsey Ave
Project Areas: Bathroom 1, Downstairs Hallway, Family Room, Kitchen
Short Description: Installation of luxury vinyl plank (LVP) flooring throughout the kitchen, living room, hallway, and bathroom to create a continuous, cohesive surface without unnecessary transitions.
A stairnose will be installed at the top of the basement stairs, along with a proper transition where the new flooring meets the existing tile, for a clean, finished look.
The toilet and pedestal sink will be removed to allow flooring installation underneath, then reinstalled. The washer and dryer will also be disconnected, moved, and reinstalled to ensure full flooring coverage and a consistent finish.
Main Product: Panzu - 12 mil (Sicily) [All Project Areas]
Main Service: LVP Installation (Floating) [All Project Areas]
Install floating LVP flooring per manufacturer's specifications.
Additional Services:
- Skim Coat – SF [All Project Areas]
Skimcoat subfloor with cement patching compound as needed to meet manufacturer's specifications.
- (RES) Primed White Quarter Round Install [All Project Areas]
Install new primed white quarter round.
- 4" Cove Base Installation [All Project Areas]
4" vinyl cove base installation throughout specified project area.
- (RES) Toilet Pull [Bathroom 1]
Pull toilet prior to new flooring installation. Reinstall the toilet with a new wax ring on top of the new floor.
- ((Res)) Vanity Pull [Bathroom 1]
Bathroom vanity removed and installed over top of new floor. [DOES NOT INCLUDE POTENTIAL PIPE OR VALVE REPLACEMENT IF DAMAGED]
- Washer/Dryer Disconnect [Bathroom 1]
Disconnect washer or dryer.
Total Project Investment
$5,057.49
Project Progress
Amanda Vogel
Agreement
& Deposit
>
Materials
Preparation
>
Scheduling
>
Installation
>
Project Complete
Payment Made
Materials Preparation
We’re preparing and coordinating your materials.
Materials Sourced
Scheduling
Our team will confirm your installation date.
(Phone and email confirmation to go over necessary preparation requirements and confirm your installation date.)
Scheduled
Installation
Pre-install walkthrough, final invoice, installation.
(Final walk-through will commence immediately upon installation completion.)
Installed
Project Complete
Thank you for working with Better Call Paul Flooring
Pending Signature & Deposit
Agreement & Deposit
Complete your agreement and submit your deposit to secure your pricing and move your project forward.
Promotional pricing is not held beyond 5 days without signed agreement and deposit
Project Scope
Project Address: 2119 Guernsey Ave
Project Areas: Bathroom 1, Downstairs Hallway, Family Room, Kitchen
Short Description: Installation of luxury vinyl plank (LVP) flooring throughout the kitchen, living room, hallway, and bathroom to create a continuous, cohesive surface without unnecessary transitions.
A stairnose will be installed at the top of the basement stairs, along with a proper transition where the new flooring meets the existing tile, for a clean, finished look.
The toilet and pedestal sink will be removed to allow flooring installation underneath, then reinstalled. The washer and dryer will also be disconnected, moved, and reinstalled to ensure full flooring coverage and a consistent finish.
Main Product: Panzu - 12 mil (Sicily) [All Project Areas]
Main Service: LVP Installation (Floating) [All Project Areas]
Install floating LVP flooring per manufacturer's specifications.
Additional Services:
- Skim Coat – SF [All Project Areas]
Skimcoat subfloor with cement patching compound as needed to meet manufacturer's specifications.
- (RES) Primed White Quarter Round Install [All Project Areas]
Install new primed white quarter round.
- 4" Cove Base Installation [All Project Areas]
4" vinyl cove base installation throughout specified project area.
- (RES) Toilet Pull [Bathroom 1]
Pull toilet prior to new flooring installation. Reinstall the toilet with a new wax ring on top of the new floor.
- ((Res)) Vanity Pull [Bathroom 1]
Bathroom vanity removed and installed over top of new floor. [DOES NOT INCLUDE POTENTIAL PIPE OR VALVE REPLACEMENT IF DAMAGED]
- Washer/Dryer Disconnect [Bathroom 1]
Disconnect washer or dryer.
Quote Expired
If you'd like our team to re-issue your quote, just give us a call.
(If your quote was issued more than 6 months ago, we may require another visit to confirm conditions)

