top of page
Limited Time Offer

Quote Expiration:

April 16, 2026

Countdown

Our Price:

$6,136.23

You Save

$1,078.74

OUR PRICE

$6,136.23

BUY-TODAY PRICE

$5,057.49

As Low As

$117.41

Per Month

*Estimated monthly payment based on available financing options. Subject to credit approval, terms, and conditions.

Satisfaction Guarantee

*Warranties Included

Expert Installation

Discounts applied are valid for appointment only and will revert to our standard pricing the following day.

Project Scope |

Amanda Vogel

Project Address: 2119 Guernsey Ave

Project Areas: Bathroom 1, Downstairs Hallway, Family Room, Kitchen

 

Short Description: Installation of luxury vinyl plank (LVP) flooring throughout the kitchen, living room, hallway, and bathroom to create a continuous, cohesive surface without unnecessary transitions.

 

A stairnose will be installed at the top of the basement stairs, along with a proper transition where the new flooring meets the existing tile, for a clean, finished look.

 

The toilet and pedestal sink will be removed to allow flooring installation underneath, then reinstalled. The washer and dryer will also be disconnected, moved, and reinstalled to ensure full flooring coverage and a consistent finish.

 

Main Product: Panzu - 12 mil (Sicily) [All Project Areas]

 

Main Service: LVP Installation (Floating) [All Project Areas]

Install floating LVP flooring per manufacturer's specifications.

 

Additional Services:

- Skim Coat – SF [All Project Areas]

Skimcoat subfloor with cement patching compound as needed to meet manufacturer's specifications.

 

- (RES) Primed White Quarter Round Install [All Project Areas]

Install new primed white quarter round.

 

- 4" Cove Base Installation [All Project Areas]

4" vinyl cove base installation throughout specified project area.

 

- (RES) Toilet Pull [Bathroom 1]

Pull toilet prior to new flooring installation. Reinstall the toilet with a new wax ring on top of the new floor.

 

- ((Res)) Vanity Pull [Bathroom 1]

Bathroom vanity removed and installed over top of new floor. [DOES NOT INCLUDE POTENTIAL PIPE OR VALVE REPLACEMENT IF DAMAGED]

 

- Washer/Dryer Disconnect [Bathroom 1]

Disconnect washer or dryer.

 

 

 

Total Project Investment

$5,057.49

Project Progress

Amanda Vogel

Agreement

& Deposit

>

Materials

Preparation

>

Scheduling

>

Installation

>

Project Complete

Payment Made

Materials Preparation

We’re preparing and coordinating your materials.

Materials Sourced

Scheduling

Our team will confirm your installation date.

(Phone and email confirmation to go over necessary preparation requirements and confirm your installation date.)

Scheduled

Installation

Pre-install walkthrough, final invoice, installation.

(Final walk-through will commence immediately upon installation completion.)

Installed

Project Complete

Thank you for working with Better Call Paul Flooring

Pending Signature & Deposit

Agreement & Deposit

Complete your agreement and submit your deposit to secure your pricing and move your project forward.

Promotional pricing is not held beyond 5 days without signed agreement and deposit

Project Scope

Project Address: 2119 Guernsey Ave

Project Areas: Bathroom 1, Downstairs Hallway, Family Room, Kitchen

 

Short Description: Installation of luxury vinyl plank (LVP) flooring throughout the kitchen, living room, hallway, and bathroom to create a continuous, cohesive surface without unnecessary transitions.

 

A stairnose will be installed at the top of the basement stairs, along with a proper transition where the new flooring meets the existing tile, for a clean, finished look.

 

The toilet and pedestal sink will be removed to allow flooring installation underneath, then reinstalled. The washer and dryer will also be disconnected, moved, and reinstalled to ensure full flooring coverage and a consistent finish.

 

Main Product: Panzu - 12 mil (Sicily) [All Project Areas]

 

Main Service: LVP Installation (Floating) [All Project Areas]

Install floating LVP flooring per manufacturer's specifications.

 

Additional Services:

- Skim Coat – SF [All Project Areas]

Skimcoat subfloor with cement patching compound as needed to meet manufacturer's specifications.

 

- (RES) Primed White Quarter Round Install [All Project Areas]

Install new primed white quarter round.

 

- 4" Cove Base Installation [All Project Areas]

4" vinyl cove base installation throughout specified project area.

 

- (RES) Toilet Pull [Bathroom 1]

Pull toilet prior to new flooring installation. Reinstall the toilet with a new wax ring on top of the new floor.

 

- ((Res)) Vanity Pull [Bathroom 1]

Bathroom vanity removed and installed over top of new floor. [DOES NOT INCLUDE POTENTIAL PIPE OR VALVE REPLACEMENT IF DAMAGED]

 

- Washer/Dryer Disconnect [Bathroom 1]

Disconnect washer or dryer.

 

 

 

Quote Expired

If you'd like our team to re-issue your quote, just give us a call.

(If your quote was issued more than 6 months ago, we may require another visit to confirm conditions)

bottom of page