top of page
Limited Time Offer

Quote Expiration:

April 3, 2026

Countdown

Our Price:

$5,987.50

You Save

$0.00

OUR PRICE

$5,987.50

BUY-TODAY PRICE

$5,987.50

As Low As

Per Month

*Estimated monthly payment based on available financing options. Subject to credit approval, terms, and conditions.

Satisfaction Guarantee

*Warranties Included

Expert Installation

Discounts applied are valid for appointment only and will revert to our standard pricing the following day.

Project Scope |

Thomas Fennen

Project Address: 3 N. Columbus Blvd Apt 218

Project Areas: Bathroom 1, Bedroom 1, Living Room, Closets (All Areas Mentioned)

 

Short Description: No demo

Furniture moving as needed

Install GD LVP in living room over existing wood

Install Carpet in bedroom Demo laminate

Install white primer quarter round in perimeter of living room

LVP install with skim coat in bathroom

 

Main Product: V-EVO® Max - 20 mil (Blenheim) [Bathroom 1, Living Room]

 

Main Service: LVP Installation (Glue Down) [Bathroom 1, Living Room]

Install LVP flooring with pressure sensitive adhesive per manufacturer's specifications.

 

Additional Products:

- Allure - 40oz (TBD) [Bedroom 1, Closets (All Areas Mentioned)]

 

Additional Services:

- (RES) Furniture Moving [All Project Areas]

Move and replace furniture as required for installation.

 

- Carpet Installation (Stretch & Tact) [Bedroom 1, Including All Closets]

• Preparation

• 7/16" spillproof padding installation

• Carpet installation (stretched to manufacturers specs)

 

- (RES) Primed White Quarter Round Install [Bathroom 1, Living Room]

Install new primed white quarter round.

 

- Skim Coat – SF [Bathroom 1]

Skimcoat subfloor with cement patching compound as needed to meet manufacturer's specifications.

 

- Toilet Pull and Reinstall [Bathroom 1]

Pull toilet prior to new flooring installation. Reinstall the toilet with a new wax ring on top of the new floor.

 

- Laminate Demo [Bedroom 1]

Remove and haul away existing laminate flooring.

 

 

 

Total Project Investment

$5,987.50

Project Progress

Thomas Fennen

Agreement

& Deposit

>

Materials

Preparation

>

Scheduling

>

Installation

>

Project Complete

Payment Made

Materials Preparation

We’re preparing and coordinating your materials.

Materials Sourced

Scheduling

Our team will confirm your installation date.

(Phone and email confirmation to go over necessary preparation requirements and confirm your installation date.)

Scheduled

Installation

Pre-install walkthrough, final invoice, installation.

(Final walk-through will commence immediately upon installation completion.)

Installed

Project Complete

Thank you for working with Better Call Paul Flooring

Pending Signature & Deposit

Agreement & Deposit

Complete your agreement and submit your deposit to secure your pricing and move your project forward.

Promotional pricing is not held beyond 5 days without signed agreement and deposit

Project Scope

Project Address: 3 N. Columbus Blvd Apt 218

Project Areas: Bathroom 1, Bedroom 1, Living Room, Closets (All Areas Mentioned)

 

Short Description: No demo

Furniture moving as needed

Install GD LVP in living room over existing wood

Install Carpet in bedroom Demo laminate

Install white primer quarter round in perimeter of living room

LVP install with skim coat in bathroom

 

Main Product: V-EVO® Max - 20 mil (Blenheim) [Bathroom 1, Living Room]

 

Main Service: LVP Installation (Glue Down) [Bathroom 1, Living Room]

Install LVP flooring with pressure sensitive adhesive per manufacturer's specifications.

 

Additional Products:

- Allure - 40oz (TBD) [Bedroom 1, Closets (All Areas Mentioned)]

 

Additional Services:

- (RES) Furniture Moving [All Project Areas]

Move and replace furniture as required for installation.

 

- Carpet Installation (Stretch & Tact) [Bedroom 1, Including All Closets]

• Preparation

• 7/16" spillproof padding installation

• Carpet installation (stretched to manufacturers specs)

 

- (RES) Primed White Quarter Round Install [Bathroom 1, Living Room]

Install new primed white quarter round.

 

- Skim Coat – SF [Bathroom 1]

Skimcoat subfloor with cement patching compound as needed to meet manufacturer's specifications.

 

- Toilet Pull and Reinstall [Bathroom 1]

Pull toilet prior to new flooring installation. Reinstall the toilet with a new wax ring on top of the new floor.

 

- Laminate Demo [Bedroom 1]

Remove and haul away existing laminate flooring.

 

 

 

Quote Expired

If you'd like our team to re-issue your quote, just give us a call.

(If your quote was issued more than 6 months ago, we may require another visit to confirm conditions)

bottom of page