Limited Time Offer
Quote Expiration:
May 5, 2026

Countdown
Our Price:
$21,315.01
You Save
$2,131.50
OUR PRICE
$21,315.01
BUY-TODAY PRICE
$19,183.51
As Low As
$297.85
Per Month
*Estimated monthly payment based on available financing options. Subject to credit approval, terms, and conditions.
Satisfaction Guarantee
*Warranties Included
Expert Installation
Discounts applied are valid for appointment only and will revert to our standard pricing the following day.
Project Scope |
Emma Mangano
Project Address: 17 Ruhl Dr.
Project Areas: Entire 1st Floor, Entire 2nd Floor
Short Description: Installation of engineered hardwood throughout entirety of home excluding upstairs bathroom.
Main Product: Customer Provided Material (Champagne sea) [All Project Areas]
Main Service: Engineered Hardwood Installation (Nail Down) [All Project Areas]
Install engineered hardwood by nail down method per manufacturer's specifications.
Additional Services:
- (RES) Toilet Pull [Bathroom 1]
Pull toilet prior to new flooring installation. Reinstall the toilet with a new wax ring on top of the new floor.
- 3" Baseboard Installation [All Project Areas]
Installation of primed white baseboard throughout specified project area.
- Vapor Barrier – Per Unit [Entire 1st Floor]
6mil vapor barrier installation for moisture mitigation. 127 sq ft coverage per roll.
- Self-Leveler – Per Bag [Entire 1st Floor]
Install self leveling underlayment as required to meet manufacturer's specifications.
- Engineered Hardwood Installation (Glue Down) [Entire 1st Floor]
Install engineered hardwood flooring with full spread glue method.
Staircase Service: Remove Carpet, Install LVP (Premium) - 12 Steps [12 boxed]
Total Project Investment
$19,183.51
Project Progress
Emma Mangano
Agreement
& Deposit
>
Materials
Preparation
>
Scheduling
>
Installation
>
Project Complete
Payment Made
Materials Preparation
We’re preparing and coordinating your materials.
Materials Sourced
Scheduling
Our team will confirm your installation date.
(Phone and email confirmation to go over necessary preparation requirements and confirm your installation date.)
Scheduled
Installation
Pre-install walkthrough, final invoice, installation.
(Final walk-through will commence immediately upon installation completion.)
Installed
Project Complete
Thank you for working with Better Call Paul Flooring
Pending Signature & Deposit
Agreement & Deposit
Complete your agreement and submit your deposit to secure your pricing and move your project forward.
Promotional pricing is not held beyond 5 days without signed agreement and deposit
Project Scope
Project Address: 17 Ruhl Dr.
Project Areas: Entire 1st Floor, Entire 2nd Floor
Short Description: Installation of engineered hardwood throughout entirety of home excluding upstairs bathroom.
Main Product: Customer Provided Material (Champagne sea) [All Project Areas]
Main Service: Engineered Hardwood Installation (Nail Down) [All Project Areas]
Install engineered hardwood by nail down method per manufacturer's specifications.
Additional Services:
- (RES) Toilet Pull [Bathroom 1]
Pull toilet prior to new flooring installation. Reinstall the toilet with a new wax ring on top of the new floor.
- 3" Baseboard Installation [All Project Areas]
Installation of primed white baseboard throughout specified project area.
- Vapor Barrier – Per Unit [Entire 1st Floor]
6mil vapor barrier installation for moisture mitigation. 127 sq ft coverage per roll.
- Self-Leveler – Per Bag [Entire 1st Floor]
Install self leveling underlayment as required to meet manufacturer's specifications.
- Engineered Hardwood Installation (Glue Down) [Entire 1st Floor]
Install engineered hardwood flooring with full spread glue method.
Staircase Service: Remove Carpet, Install LVP (Premium) - 12 Steps [12 boxed]
Quote Expired
If you'd like our team to re-issue your quote, just give us a call.
(If your quote was issued more than 6 months ago, we may require another visit to confirm conditions)

