top of page
Limited Time Offer

Quote Expiration:

April 24, 2026

Countdown

Our Price:

$4,462.39

You Save

$422.89

OUR PRICE

$4,462.39

BUY-TODAY PRICE

$4,039.50

As Low As

$62.72

Per Month

*Estimated monthly payment based on available financing options. Subject to credit approval, terms, and conditions.

Satisfaction Guarantee

*Warranties Included

Expert Installation

Discounts applied are valid for appointment only and will revert to our standard pricing the following day.

Project Scope |

Rhonda Lowery

Project Address: 5224 Marlton Pike; Lot #16

Project Areas: Entire 1st Floor

 

Short Description: Demo of glue down lvp for entirety of first floor, followed by new carpet installation and lvt installation.

 

Main Product: Allure - 40oz (tan lines) [Bedroom 1, Living Room, Closet (BD 1)]

 

Main Service: Carpet Installation (Stretch & Tact) [Bedroom 1, Living Room]

• Preparation

• 7/16" spillproof padding installation

• Carpet installation (stretched to manufacturers specs)

 

Additional Products:

- Notify - 12mil GD (Mahogany) [Kitchen, Bathroom 1]

 

Additional Services:

- LVP Demo [All Project Areas]

Remove and haul away LVP flooring.

 

- LVP Installation (Glue Down) [Kitchen, Bathroom 1]

Install LVP flooring with pressure sensitive adhesive per manufacturer's specifications.

 

- (RES) Primed White Quarter Round Install [Kitchen, Bathroom 1]

Install new primed white quarter round.

 

- Skim Coat – SF [Kitchen, Bathroom 1]

Skimcoat subfloor with cement patching compound as needed to meet manufacturer's specifications.

 

- Self-Leveler – Per Bag [Kitchen]

Install self leveling underlayment as required to meet manufacturer's specifications.

 

- (RES) Furniture Moving [All Project Areas]

Move and replace furniture as required for installation.

 

- (RES) Toilet Pull [Bathroom 1]

Pull toilet prior to new flooring installation. Reinstall the toilet with a new wax ring on top of the new floor.

 

- ((Res)) Vanity Pull [Bathroom 1]

Bathroom vanity removed and installed over top of new floor. [DOES NOT INCLUDE POTENTIAL PIPE OR VALVE REPLACEMENT IF DAMAGED]

 

 

 

Total Project Investment

$4,039.50

Project Progress

Rhonda Lowery

Agreement

& Deposit

>

Materials

Preparation

>

Scheduling

>

Installation

>

Project Complete

Payment Made

Materials Preparation

We’re preparing and coordinating your materials.

Materials Sourced

Scheduling

Our team will confirm your installation date.

(Phone and email confirmation to go over necessary preparation requirements and confirm your installation date.)

Scheduled

Installation

Pre-install walkthrough, final invoice, installation.

(Final walk-through will commence immediately upon installation completion.)

Installed

Project Complete

Thank you for working with Better Call Paul Flooring

Pending Signature & Deposit

Agreement & Deposit

Complete your agreement and submit your deposit to secure your pricing and move your project forward.

Promotional pricing is not held beyond 5 days without signed agreement and deposit

Project Scope

Project Address: 5224 Marlton Pike; Lot #16

Project Areas: Entire 1st Floor

 

Short Description: Demo of glue down lvp for entirety of first floor, followed by new carpet installation and lvt installation.

 

Main Product: Allure - 40oz (tan lines) [Bedroom 1, Living Room, Closet (BD 1)]

 

Main Service: Carpet Installation (Stretch & Tact) [Bedroom 1, Living Room]

• Preparation

• 7/16" spillproof padding installation

• Carpet installation (stretched to manufacturers specs)

 

Additional Products:

- Notify - 12mil GD (Mahogany) [Kitchen, Bathroom 1]

 

Additional Services:

- LVP Demo [All Project Areas]

Remove and haul away LVP flooring.

 

- LVP Installation (Glue Down) [Kitchen, Bathroom 1]

Install LVP flooring with pressure sensitive adhesive per manufacturer's specifications.

 

- (RES) Primed White Quarter Round Install [Kitchen, Bathroom 1]

Install new primed white quarter round.

 

- Skim Coat – SF [Kitchen, Bathroom 1]

Skimcoat subfloor with cement patching compound as needed to meet manufacturer's specifications.

 

- Self-Leveler – Per Bag [Kitchen]

Install self leveling underlayment as required to meet manufacturer's specifications.

 

- (RES) Furniture Moving [All Project Areas]

Move and replace furniture as required for installation.

 

- (RES) Toilet Pull [Bathroom 1]

Pull toilet prior to new flooring installation. Reinstall the toilet with a new wax ring on top of the new floor.

 

- ((Res)) Vanity Pull [Bathroom 1]

Bathroom vanity removed and installed over top of new floor. [DOES NOT INCLUDE POTENTIAL PIPE OR VALVE REPLACEMENT IF DAMAGED]

 

 

 

Quote Expired

If you'd like our team to re-issue your quote, just give us a call.

(If your quote was issued more than 6 months ago, we may require another visit to confirm conditions)

bottom of page