Limited Time Offer
Quote Expiration:
April 24, 2026

Countdown
Our Price:
$4,462.39
You Save
$422.89
OUR PRICE
$4,462.39
BUY-TODAY PRICE
$4,039.50
As Low As
$62.72
Per Month
*Estimated monthly payment based on available financing options. Subject to credit approval, terms, and conditions.
Satisfaction Guarantee
*Warranties Included
Expert Installation
Discounts applied are valid for appointment only and will revert to our standard pricing the following day.
Project Scope |
Rhonda Lowery
Project Address: 5224 Marlton Pike; Lot #16
Project Areas: Entire 1st Floor
Short Description: Demo of glue down lvp for entirety of first floor, followed by new carpet installation and lvt installation.
Main Product: Allure - 40oz (tan lines) [Bedroom 1, Living Room, Closet (BD 1)]
Main Service: Carpet Installation (Stretch & Tact) [Bedroom 1, Living Room]
• Preparation
• 7/16" spillproof padding installation
• Carpet installation (stretched to manufacturers specs)
Additional Products:
- Notify - 12mil GD (Mahogany) [Kitchen, Bathroom 1]
Additional Services:
- LVP Demo [All Project Areas]
Remove and haul away LVP flooring.
- LVP Installation (Glue Down) [Kitchen, Bathroom 1]
Install LVP flooring with pressure sensitive adhesive per manufacturer's specifications.
- (RES) Primed White Quarter Round Install [Kitchen, Bathroom 1]
Install new primed white quarter round.
- Skim Coat – SF [Kitchen, Bathroom 1]
Skimcoat subfloor with cement patching compound as needed to meet manufacturer's specifications.
- Self-Leveler – Per Bag [Kitchen]
Install self leveling underlayment as required to meet manufacturer's specifications.
- (RES) Furniture Moving [All Project Areas]
Move and replace furniture as required for installation.
- (RES) Toilet Pull [Bathroom 1]
Pull toilet prior to new flooring installation. Reinstall the toilet with a new wax ring on top of the new floor.
- ((Res)) Vanity Pull [Bathroom 1]
Bathroom vanity removed and installed over top of new floor. [DOES NOT INCLUDE POTENTIAL PIPE OR VALVE REPLACEMENT IF DAMAGED]
Total Project Investment
$4,039.50
Project Progress
Rhonda Lowery
Agreement
& Deposit
>
Materials
Preparation
>
Scheduling
>
Installation
>
Project Complete
Payment Made
Materials Preparation
We’re preparing and coordinating your materials.
Materials Sourced
Scheduling
Our team will confirm your installation date.
(Phone and email confirmation to go over necessary preparation requirements and confirm your installation date.)
Scheduled
Installation
Pre-install walkthrough, final invoice, installation.
(Final walk-through will commence immediately upon installation completion.)
Installed
Project Complete
Thank you for working with Better Call Paul Flooring
Pending Signature & Deposit
Agreement & Deposit
Complete your agreement and submit your deposit to secure your pricing and move your project forward.
Promotional pricing is not held beyond 5 days without signed agreement and deposit
Project Scope
Project Address: 5224 Marlton Pike; Lot #16
Project Areas: Entire 1st Floor
Short Description: Demo of glue down lvp for entirety of first floor, followed by new carpet installation and lvt installation.
Main Product: Allure - 40oz (tan lines) [Bedroom 1, Living Room, Closet (BD 1)]
Main Service: Carpet Installation (Stretch & Tact) [Bedroom 1, Living Room]
• Preparation
• 7/16" spillproof padding installation
• Carpet installation (stretched to manufacturers specs)
Additional Products:
- Notify - 12mil GD (Mahogany) [Kitchen, Bathroom 1]
Additional Services:
- LVP Demo [All Project Areas]
Remove and haul away LVP flooring.
- LVP Installation (Glue Down) [Kitchen, Bathroom 1]
Install LVP flooring with pressure sensitive adhesive per manufacturer's specifications.
- (RES) Primed White Quarter Round Install [Kitchen, Bathroom 1]
Install new primed white quarter round.
- Skim Coat – SF [Kitchen, Bathroom 1]
Skimcoat subfloor with cement patching compound as needed to meet manufacturer's specifications.
- Self-Leveler – Per Bag [Kitchen]
Install self leveling underlayment as required to meet manufacturer's specifications.
- (RES) Furniture Moving [All Project Areas]
Move and replace furniture as required for installation.
- (RES) Toilet Pull [Bathroom 1]
Pull toilet prior to new flooring installation. Reinstall the toilet with a new wax ring on top of the new floor.
- ((Res)) Vanity Pull [Bathroom 1]
Bathroom vanity removed and installed over top of new floor. [DOES NOT INCLUDE POTENTIAL PIPE OR VALVE REPLACEMENT IF DAMAGED]
Quote Expired
If you'd like our team to re-issue your quote, just give us a call.
(If your quote was issued more than 6 months ago, we may require another visit to confirm conditions)

