top of page
Limited Time Offer

Quote Expiration:

April 30, 2026

Countdown

Our Price:

$1,463.70

You Save

$146.37

OUR PRICE

$1,463.70

BUY-TODAY PRICE

$1,317.33

As Low As

$20.45

Per Month

*Estimated monthly payment based on available financing options. Subject to credit approval, terms, and conditions.

Satisfaction Guarantee

*Warranties Included

Expert Installation

Discounts applied are valid for appointment only and will revert to our standard pricing the following day.

Project Scope |

Stephanie RMS

Project Address: 3451 Aramingo Ave

Project Scope: Provide localized repair of damaged VCT flooring. Work includes site inspection, removal and replacement of up to 20 damaged tiles, substrate preparation, installation of new VCT, and blending with surrounding flooring. Substrate will be scraped, cleaned, and patched as required to support installation.

 

VCT will be matched visually unless exact product information is provided. Exact match is not guaranteed due to lot variation, age, and wear.

 

Observed conditions (cracked, missing, and previously patched tiles with exposed substrate) indicate this is not a singular isolated repair. Removal may cause adjacent tiles to release and may uncover additional substrate issues, including failed patching, residual adhesive, or surface irregularities. If encountered, additional corrective work will be required to restore a stable, serviceable surface.

 

VCT Floor Repair (Up to 20 Tiles) — $1,386.67

 

Initial inspection and verification — $69.34

Tile removal and surface preparation — $265.00

VCT material, adhesive, and patch — $185.33

Tile installation labor — $420.00

Localized substrate prep/patching — $257.00

Mobilization, protection, and cleanup — $190.00

 

Total — $1,386.67

 

Contingency Repair (If Required) — $1,086.26

 

Applied if surrounding tiles release or if underlying conditions extend beyond the initial repair area during removal.

 

Expanded tile removal and replacement labor — $570.00

Extended substrate preparation and correction — $420.00

Additional materials — $96.26

 

Total — $1,086.26

Total Project Investment

$1,317.33

Project Progress

Stephanie RMS

Agreement

& Deposit

>

Materials

Preparation

>

Scheduling

>

Installation

>

Project Complete

Payment Made

Materials Preparation

We’re preparing and coordinating your materials.

Materials Sourced

Scheduling

Our team will confirm your installation date.

(Phone and email confirmation to go over necessary preparation requirements and confirm your installation date.)

Scheduled

Installation

Pre-install walkthrough, final invoice, installation.

(Final walk-through will commence immediately upon installation completion.)

Installed

Project Complete

Thank you for working with Better Call Paul Flooring

Pending Signature & Deposit

Agreement & Deposit

Complete your agreement and submit your deposit to secure your pricing and move your project forward.

Promotional pricing is not held beyond 5 days without signed agreement and deposit

Project Scope

Project Address: 3451 Aramingo Ave

Project Scope: Provide localized repair of damaged VCT flooring. Work includes site inspection, removal and replacement of up to 20 damaged tiles, substrate preparation, installation of new VCT, and blending with surrounding flooring. Substrate will be scraped, cleaned, and patched as required to support installation.

 

VCT will be matched visually unless exact product information is provided. Exact match is not guaranteed due to lot variation, age, and wear.

 

Observed conditions (cracked, missing, and previously patched tiles with exposed substrate) indicate this is not a singular isolated repair. Removal may cause adjacent tiles to release and may uncover additional substrate issues, including failed patching, residual adhesive, or surface irregularities. If encountered, additional corrective work will be required to restore a stable, serviceable surface.

 

VCT Floor Repair (Up to 20 Tiles) — $1,386.67

 

Initial inspection and verification — $69.34

Tile removal and surface preparation — $265.00

VCT material, adhesive, and patch — $185.33

Tile installation labor — $420.00

Localized substrate prep/patching — $257.00

Mobilization, protection, and cleanup — $190.00

 

Total — $1,386.67

 

Contingency Repair (If Required) — $1,086.26

 

Applied if surrounding tiles release or if underlying conditions extend beyond the initial repair area during removal.

 

Expanded tile removal and replacement labor — $570.00

Extended substrate preparation and correction — $420.00

Additional materials — $96.26

 

Total — $1,086.26

Quote Expired

If you'd like our team to re-issue your quote, just give us a call.

(If your quote was issued more than 6 months ago, we may require another visit to confirm conditions)

bottom of page