top of page
Limited Time Offer

Quote Expiration:

May 31, 2026

Countdown

Our Price:

$21,229.03

You Save

$5,245.33

OUR PRICE

$21,229.03

BUY-TODAY PRICE

$16,047.76

As Low As

$249.16

Per Month

*Estimated monthly payment based on available financing options. Subject to credit approval, terms, and conditions.

Satisfaction Guarantee

*Warranties Included

Expert Installation

Discounts applied are valid for appointment only and will revert to our standard pricing the following day.

Project Scope |

Sam Orion

Project Address: 2616 East Allegany Ave

Project Areas: Entire 1st Floor, Entire 2nd Floor

 

Short Description: Small section of stick and peel demo

Install lvp or hardwood in 2 floors

Install tile with hardie board in kitchen and first floor bath

No furniture moving home is vacant

No demo, old original hardwood to serve as subfloor

 

Main Product: Additional Material Item (Gunstock) [All Project Areas]

 

Main Service: Solid Hardwood Installation (Nail Down) [All Project Areas]

Installation of solid hardwood flooring by nail down method per manufacturer's specifications.

 

Additional Products:

- Choice - 12"x12" (Everest White) [Kitchen, Bathroom 1]

 

Additional Services:

- Tile Installation SL [Kitchen, Bathroom 1]

• Preparation

• Installation (straight lay pattern 12"x12" - 12"x24")

• Materials (grout, mortar, spacers and clips)

• Transitions (if necessary)

 

- (RES) Cement Backer Board Installation - SF [Kitchen, Bathroom 1]

Hardie backer board installation for tile installed over top of wood sub flooring. Includes Hardie screws.

 

- Glue Down Vinyl/Linoleum Demo [Bathroom 1]

Demo and haul away of existing vinyl or linoleum flooring.

 

- (RES) Primed White Quarter Round Install [All Project Areas]

Install new primed white quarter round.

 

 

 

Total Project Investment

$16,047.76

Project Progress

Sam Orion

Agreement

& Deposit

>

Materials

Preparation

>

Scheduling

>

Installation

>

Project Complete

Payment Made

Materials Preparation

We’re preparing and coordinating your materials.

Materials Sourced

Scheduling

Our team will confirm your installation date.

(Phone and email confirmation to go over necessary preparation requirements and confirm your installation date.)

Scheduled

Installation

Pre-install walkthrough, final invoice, installation.

(Final walk-through will commence immediately upon installation completion.)

Installed

Project Complete

Thank you for working with Better Call Paul Flooring

Pending Signature & Deposit

Agreement & Deposit

Complete your agreement and submit your deposit to secure your pricing and move your project forward.

Promotional pricing is not held beyond 5 days without signed agreement and deposit

Project Scope

Project Address: 2616 East Allegany Ave

Project Areas: Entire 1st Floor, Entire 2nd Floor

 

Short Description: Small section of stick and peel demo

Install lvp or hardwood in 2 floors

Install tile with hardie board in kitchen and first floor bath

No furniture moving home is vacant

No demo, old original hardwood to serve as subfloor

 

Main Product: Additional Material Item (Gunstock) [All Project Areas]

 

Main Service: Solid Hardwood Installation (Nail Down) [All Project Areas]

Installation of solid hardwood flooring by nail down method per manufacturer's specifications.

 

Additional Products:

- Choice - 12"x12" (Everest White) [Kitchen, Bathroom 1]

 

Additional Services:

- Tile Installation SL [Kitchen, Bathroom 1]

• Preparation

• Installation (straight lay pattern 12"x12" - 12"x24")

• Materials (grout, mortar, spacers and clips)

• Transitions (if necessary)

 

- (RES) Cement Backer Board Installation - SF [Kitchen, Bathroom 1]

Hardie backer board installation for tile installed over top of wood sub flooring. Includes Hardie screws.

 

- Glue Down Vinyl/Linoleum Demo [Bathroom 1]

Demo and haul away of existing vinyl or linoleum flooring.

 

- (RES) Primed White Quarter Round Install [All Project Areas]

Install new primed white quarter round.

 

 

 

Quote Expired

If you'd like our team to re-issue your quote, just give us a call.

(If your quote was issued more than 6 months ago, we may require another visit to confirm conditions)

bottom of page